江蘇春晨電纜有限公司FDEG-40(-55) 0.6/1kV;FDEG風(fēng)能電纜
1.8/3kV 銅芯乙丙橡皮絕緣硅橡膠橡皮護(hù)套風(fēng)力發(fā)電用耐寒(耐嚴(yán)寒)耐扭曲軟電纜 風(fēng)力發(fā)電電纜,
1, trunk cable;FDEG風(fēng)能電纜
2、分支線;
2, branch line;
3分支接頭:
3 branch connector:
4相關(guān)附件,并具有三種類型:普通型、阻燃型(ZR)、耐火型(NH)。
4 related accessories, and has three types: ordinary type, flame retardant type (ZR), fire resistant type (NH).
預(yù)分支電纜具有可靠性高、安裝簡便、環(huán)境要求低、免維護(hù)等優(yōu)點(diǎn)。分支線預(yù)先制造在主干電纜上,分支線截面大小和分支線長度等是根據(jù)設(shè)計(jì)要求決定,*縮短了施工周期,大幅度減少材料費(fèi)用和施工費(fèi)用,更大地保證了配電的可靠性。預(yù)分支電纜是國外近年來大量使用的一種新型低壓供電系統(tǒng),可廣泛用于供電線路中有電纜分支的場合。如高層建筑及普通住宅樓、大型建筑及場館、標(biāo)準(zhǔn)化廠房、移動(dòng)設(shè)備和機(jī)械、工業(yè)窯爐、公路、橋涵、機(jī)場等。
Pre branch cable has the advantages of high reliability, easy installation, low environmental requirements, maintenance free and so on. Advance in manufacturing branch line cable trunk, branch line section size and branch line length is determined according to the design requirements, greatly shorten the construction period, reduce material costs and construction costs, ensure greater reliability distribution. Pre branch cable is a new type of low-voltage power supply system, which is widely used in recent years. It can be widely used in the power supply line with the branch of the cable. Such as high-rise buildings and ordinary residential buildings, large buildings and stadiums, standard workshops, equipment and machinery, industrial furnace, highway, bridge, airport etc..
預(yù)分支電纜是高層建筑中母線槽供電的替代產(chǎn)品,他具有供電可靠、安裝方便、防水性好,占建筑面積小、故障率低、價(jià)格便宜、免維修維護(hù)等優(yōu)點(diǎn),適用于交流額定電壓為0.6/1KV配電線路中。
The branch cable is in the high-rise construction of busbar power alternative products, he has a reliable power supply, convenient installation, good waterproof, total construction area is small, the advantages of low failure rate, low price, free maintenance, suitable for rated AC voltage 0.6/1KV distribution line.
預(yù)分支電纜的安裝與敷設(shè):
Installation and laying of pre branching cable:
1.將吊鉤安裝在吊掛橫梁上;
1 will be installed on the hanging hook;
2.將吊掛橫梁安裝在預(yù)定位置;
2 will be installed in a predetermined position of the hanger beam;
3.在電纜井或電纜通道中,按主電纜截面≤300mm的每2m間距,≥400mm每1.5m間距的要求,將指甲固定在建筑物上;
3 in the cable wells or cable channel, according to the main cable section is equal to or less than 300mm per 400mm or per 1.5m 2m spacing, spacing, the nail is fixed on the building;
4.在上三項(xiàng)工作完成,經(jīng)檢查無誤后開市起吊預(yù)分支電纜;
4 in three work completed, after checking the opening of lifting prefabricated branch cable;
5.起吊到預(yù)定位置后將吊頭掛于掛鉤之上;
5 lifting to a predetermined position after the hanging head hung on the hook;
6.按設(shè)計(jì)圖紙上各分支電纜的走向要求理順方向,迅速用纜夾將主電纜緊固到支架上;
6 according to the design drawings of each branch of the cable to the direction of the demand for the rapid use of cable clips to the main cable to the bracket;
7.按設(shè)計(jì)圖紙要求,將各分支電纜和主電纜進(jìn)行線端接到已就位的各自配電柜上即可。
7 according to the requirements of the design drawings, the branch cable and the main cable line end to the respective distribution cabinet can be put in place.
了解了預(yù)分支電纜的組成部分及敷設(shè)要求,更好的幫助我們實(shí)用它們。
Understand the components of the pre branch cable and laying requirements, better help us to use them.