用途 User The valve is installed in the outlet of the pump. It is used to prevent the backflow of the medium and can be connected with the water pump to prevent water hammer phenomenon. It is applicable to water systems such as industrial and mining enterprises and high-rise buildings. 兩階段關(guān)閉防水錘效果好,明顯。The two-phase shut-off hammer has good effect and quiet sound. 原理 Principle 開閥:水泵起動,電磁閥通電打開,主閥上隔膜室的水流入下游。主閥瓣被下腔壓力水推起。 關(guān)閥:停泵前,電磁閥斷電,主閥開始關(guān)閉,當關(guān)閉至10%開度時,行程開關(guān)動作,水泵停止。余下10%開度靠介質(zhì)倒流使主閥瓣關(guān)閉。 Open valve: water pump starts, the solenoid valve opens, the water of the diaphragm chamber in the main valve flows downstream. The main disc is pushed by the cavity pressure. Shutoff valve: before stopping the pump, the solenoid valve is off. The main valve begins to close. When it closes to 10%, the stroke switch moves and the pump stops. The remaining 10% opening depends on the flow of the medium to close the main disc. 執(zhí)行標準 Executive standard 法蘭尺寸 Flange dimensions:GB/T 17241.6 試驗檢驗 Test test:GB/T 13927 安裝圖典型 Installation diagram
該閥安裝于水泵出口。用于防止介質(zhì)倒流,可與水泵聯(lián)動,可有效防止水錘現(xiàn)象產(chǎn)生。適用于工礦企業(yè)、高層建筑等水系統(tǒng)。
特點 Characteristic
中國·高能閥門集團騰達閥門有限公司
蝶閥
700X 水泵控制閥 產(chǎn)品信息
關(guān)鍵詞:電磁閥 行程開關(guān)